Environment Agency River Thames

Job type: Open Fireplace
Length: 13M
Diameter: 200mm
Project Length: 1 day
Completed by: Toast

Initial Situation:
At the Environment Agency River Thames office (Benson Lock house, Oxfordshire). The Flue for the open fireplace became unsafe and required relining.

Project Challenge:
Due to the geography of where the lock house was situated it was a challenge to get all FuranFlex25 equipment over the lock bridges from the vans (500 yards)

Liner Chosen:
FuranFlex25 RWV

Result:
The flue was fully restored and the open fire was now safe and operational once more.