University London Darwin Building

Job type: SE & U Duct
Project Length: 1 day
Completed by: Kompozit’all UK

Initial Situation:
University college London’s Chemical duct from chemical cabinet were leaking. Duct located in service riser with no access on floors in building.

Project Challenge:
Reline duct without need to access ductwork through the building.

Liner Chosen:
FuranFlex25 Black

Result:
Duct relined with FuranFlex Black. Access only required at each end of duct. Works completed in 5 hours in finished building with minimal disruption.

Completed by:
Kompozit’all UK

Make An Enquiry